Figure 10

Comparisons of total cost (left), number of edge-edge crossings (middle left), number of node-edge crossings (middle right), and running time (right) for Fas-induced apoptosis model. Total costs, Numbers of edge-edge intersections and node-edge intersections and running time for Grid Layout and GDC (Grid Layout with dynamic compartment update) are compared using box plots. These indicators are obtained by applying these two algorithms to ten randomly obtained layouts of the Fas-induced apoptosis model.